Durand-Arkansaw School District

Project Overview

Upon months of master planning and fundraising, the Durand-Arkansaw School District raised enough money to support the “Bauer Built Sports Complex”.

Bauer Built Sports Complex consists of a synthetic turf football field, eight-lane track, shot put/discus, long jump/triple jump, pole vault areas, dedication wall, ticket booth/plaza, press box, extension of existing bleachers and pad, stadium lighting, storage shed, and renovations to the existing parking lot with room for future parking along with developing 2 new tennis courts at the High School.

Services Provided

  • Site Evaluation
  • Wetland Delineation & Mapping
  • Geotechnical Investigation
  • Topographic Survey
  • Master Planning
  • Fundraising Support
  • Construction Documents
  • Stormwater Management
  • Permit Preparation
  • Synthetic Turf Vendor Selection Process
  • Bid Coordination
  • Construction Administration
  • Inspection/Testing
  • Construction Layout
  • Meetings/Site Visits

Project Details

Location:

Durand High School
607 7th Avenue East
Durand, WI 54736

Clientele:

Athletics

Flyover

Medford Area Public School District

Project Overview

Point of Beginning provided civil engineering, survey, and construction services for the redevelopment of Medford Area School District High School’s outdoor athletic complex.

This was a 3 phasic project – Phase 1 included the installation of a new home side bleacher with press box along with relocating 2 light poles; Phase 2 consisted of the installation of a new synthetic turf football field surface, eight-lane track, shot put/discus, long jump/triple jump, pole vault areas and a team’s room / storage building; and Phase 3 consisted of site design for the pool treatment room addition to the existing High School.

Services Provided

  • Site Evaluation
  • Wetland Delineation & Mapping
  • Geotechnical Investigation
  • Topographic Survey
  • Site Planning
  • Construction Documents
  • Stormwater Management
  • Permit Preparation
  • Synthetic Turf Vendor Selection Process
  • Bid Coordination
  • Construction Administration
  • Inspection/Testing
  • Construction Layout
  • Meetings/Site Visits

Project Details

Location:

Medford High School
1015 West Broadway Ave
Medford, WI 54451

Clientele:

Athletics

Merrill Area Public School District

Project Overview

This project consisted of providing civil engineering, architectural design, and construction services for the redevelopment of the athletic facility for Merrill High School located in Merrill, Wisconsin. This project consisted of a renovated football stadium with rubberized track and field event spaces, a new entry statement, concession stand/restroom building, plaza, bleachers, and a stormwater management plan.

Services Provide

  • Master Planning
  • Construction Documents
  • Stormwater Management
  • Permit Preparation
  • Bleacher Vendor Selection Process
  • Synthetic Turf Vendor Selection Process
  • Bid Coordination
  • Construction Services
  • Construction Layout
  • Testing Services
  • Camera Installation and Removal
  • Website Administration

Project Details

Location:

Merrill Area Public School District
Jay Stadium
1201 North Sales Street
Merrill, WI 54452

Clientele:

Athletics

Time-Lapse
Fly Over

Hortonville High School

Project Overview

Point of Beginning provided assistance with master planning for a new athletic complex for the Hortonville Area School District, High School, located in Hortonville, Wisconsin.

The improvements include the installation of synthetic turf surface for the football and soccer fields, new home team bleachers with 2,004 seats and locker rooms, the relocation of existing home side bleachers and press box to the visitors side, two-way long and triple jump lanes, two-way pole vault lanes, a new plaza and concessions area, entry and ticket booths, new scoreboard, and flag poles. Additionally the design will include re-surfacing of the existing track, reconfiguration of the existing bleachers and the existing fence around the new bleacher layout, and widened concrete walkways to include lighting.

Services Provided

  • Evaluation
  • Fundraising Support
  • Wetland Delineation & Mapping Coordination
  • Geotechnical Investigation
  • Topographic Survey & Mapping
  • Construction Documents
  • Stormwater Management
  • Permit Preparation
  • Synthetic Turf Vendor Selection Process
  • Bid Coordination
  • Construction Services

Project Details

Location:

Hortonville High School
155 Warner Street
Hortonville, WI 54944

Clientele:

Athletics

Time-Lapse

Hudson High School

Project Overview

Point of Beginning provided civil engineering, architectural design, and construction services for the development of the outdoor athletic facility for Hudson School District’s High School located in Hudson, Wisconsin. This project included a 9 Million Dollar site to include a synthetic turf field, softball fields, running track, bleacher seating for 3,000 spectators, concessions, and bathrooms.

Services Provided

  • Site Evaluation
  • Master Planning
  • Construction Documents
  • Storm Water Management
  • Permit Preparation
  • Bleacher Vendor Selection Process
  • Synthetic Turf Vendor Selection Process
  • Bid Coordination
  • Construction Services
  • Camera Installation and Removal
  • Website Administration

Project Details

Location:

Hudson High School
1501 Vine St
Hudson, WI 54016

Clientele:

Athletics

Overview

Rendering

Menomonee Falls High School

Project Overview

Point of Beginning provided civil engineering and land surveying services for the redevelopment of Menomonee Falls School District, High School’s football field to include a synthetic turf surface.

Services Provided

  • Site Evaluation
  • Wetland Delineation & Mapping
  • Geotechnical Investigation
  • Topographic Survey
  • Construction Documents
  • Stormwater Management
  • Permit Preparation
  • Synthetic Turf Vendor Selection Process
  • Bid Coordination
  • Meetings/Site Visits

Project Details

Location:

Menomonee Falls High School
W142 N8101 Merrimac Drive
Menomonee Falls, WI 53051

Clientele:

Athletics

Time-Lapse

Nathan Calder Stadium

Project Overview

Point of Beginning provided civil engineering, architectural design, and construction services for the development of the outdoor athletic facility for the Menasha Joint School District, Nathan Calder Stadium, located in Menasha, Wisconsin. This project included improvements to the entry way, refurbishing of stadium seating, installment of synthetic turf inside the track, relocation, and reconstruction of the pole vault, discus, and shot put events, and the construction of a competition soccer field.

Services Provide

  • Site Evaluation
  • Geotechnical Investigation
  • Wetland Delineation & Mapping
  • Topographic Survey
  • Plat of Survey Map
  • Private Utility Lines Locates
  • Site Planning, Construction Documents
  • Stormwater Management
  • Permit Preparation
  • Bid Coordination
  • Construction Services
  • Meetings/Site Visits

Project Details

Location:

Menasha Joint School District
Nathan Calder Stadium
950 appleton Street
Menasha, WI 54952

Clientele:

Athletics

Time-Lapse

Overview

Rendering

Lakeland University

Project Overview

Point of Beginning provided civil engineering, architectural design, and construction services for the development of the outdoor athletic facility for Lakeland University located in Sheboygan, Wisconsin. This project is to be constructed in the summer of 2017 and will include a synthetic turf football/soccer field, bleachers, stadium lighting, and a gateway entry.

Services Provided

  • Site Evaluation
  • Wetland Delineation & Mapping
  • Geotechnical Investigation
  • Topographic Survey & Mapping
  • Master Planning
  • Fundraising Support
  • Construction Documents
  • Storm Water Management
  • Permit Preparation
  • Synthetic Turf Vendor Selection
  • Bid Coordination
  • Construction Services
  • Construction Layout

Project Details

Location:

Lakeland University
W3718 South Drive
Plymouth, WI 53073

Clientele:

Athletics

Time-Lapse

Overview

Rendering

Kimberly High School

Project Overview

This project consisted of providingsite design and stormwater managementservices for the development of the indoor athletic facility for the Kimberly High School located in Kimberly, Wisconsin. Point of Beginning also assistedthe architectural firm in regards to the inside placement of field events.

Services Provided

  • Site Evaluation
  • Geotechnical Coordination
  • Survey
  • Construction Documents
  • Storm Water Management
  • Permit Preparation
  • Bid Coordination
  • Construction Administration
  • Staking
  • Meetings/Site Visits

Project Details

Location:

Kimberly High School
16620 E Kennedy Avenue
Kimberly, WI 54136

Clientele:

Athletics

Time-Lapse

Rendering

Pulaski Community School District

Project Overview

This project consisted of master planning for a new athletic complex that spans approximately 53 acres. This project has been divided into phases by client request. Phase I consisted of the development of a football stadium with track and field event spaces and phase II the baseball and softball fields, practice fields, and a pedestrian walk way. Phase II consisted of Varsity and JV baseball and softball fields, practice fields, parking lot, a pedestrian walk way, and soccer fields at the Middle School.

Services Provided

  • Site Evaluation
  • Topographic Survey and Mapping
  • Needs Assessment
  • Concept Planning
  • Master Planning
  • Geotechnical Investigation Coordination
  • Construction Documents
  • Wetland Permit Preparation
  • Contact Administration
  • Stormwater Management
  • Local and Governmental Permit Preparation
  • Bid Coordination
  • 3D Model
  • Construction Layout
  • Construction Administration
  • Material Testing
  • Permit Preparation
  • Construction Inspection/Testing

Project Details

Location:

Pulaski High School
1040 S St Augustine St
Pulaski, WI 54162

Clientele:

Athletics

Time-Lapse
Fly Over 1
Fly Over 2