Project Overview
Point of Beginning provided civil engineering, survey, and construction services for the redevelopment of Medford Area School District High School’s outdoor athletic complex.
This was a 3 phasic project – Phase 1 included the installation of a new home side bleacher with press box along with relocating 2 light poles; Phase 2 consisted of the installation of a new synthetic turf football field surface, eight-lane track, shot put/discus, long jump/triple jump, pole vault areas and a team’s room / storage building; and Phase 3 consisted of site design for the pool treatment room addition to the existing High School.
Services Provided
- Site Evaluation
- Wetland Delineation & Mapping
- Geotechnical Investigation
- Topographic Survey
- Site Planning
- Construction Documents
- Stormwater Management
- Permit Preparation
- Synthetic Turf Vendor Selection Process
- Bid Coordination
- Construction Administration
- Inspection/Testing
- Construction Layout
- Meetings/Site Visits
Project Details
Location:
Medford High School
1015 West Broadway Ave
Medford, WI 54451
Clientele:
Athletics