Stevens Point, WI Insurance Office Development

Seth Rehfeldt, Division Leader of Site Construction Layout, steers the construction staking division within POB. Seth’s skill set and knowledgeable experience on the job and of clients’ needs helps ensure that the proposed project timeline is met and that the precise project layout specifications reflect the construction plans and mark out reference points prior to the start of the project.


  • Subgrade and gravel
  • Concrete Flatwork
  • Curb and Gutter
  • Retaining Walls
  • Storm sewer
  • Sanitary Sewer
  • Water Main
  • Building (Walls, Column Lines, Bolt Patterns)
  • As-Built Surveys (Verifications)
  • Electrical
  • Asphalt
  • Signs
  • Ponds and Greenspace Grades
  • Property
  • Section Corner Monuments
  • Clearing Limits
  • GeoPiers
  • Fencing
  • Soil Borings
  • Steam tunnel
  • Monitoring
  • Control Verification