Merrill Area Public School District

Project Overview

This project consisted of providing civil engineering, architectural design, and construction services for the redevelopment of the athletic facility for Merrill High School located in Merrill, Wisconsin. This project consisted of a renovated football stadium with rubberized track and field event spaces, a new entry statement, concession stand/restroom building, plaza, bleachers, and a stormwater management plan.

Services Provide

  • Master Planning
  • Construction Documents
  • Stormwater Management
  • Permit Preparation
  • Bleacher Vendor Selection Process
  • Synthetic Turf Vendor Selection Process
  • Bid Coordination
  • Construction Services
  • Construction Layout
  • Testing Services
  • Camera Installation and Removal
  • Website Administration

Project Details

Location:

Merrill Area Public School District
Jay Stadium
1201 North Sales Street
Merrill, WI 54452

Clientele:

Athletics

Time-Lapse
Fly Over

Hudson High School

Project Overview

Point of Beginning provided civil engineering, architectural design, and construction services for the development of the outdoor athletic facility for Hudson School District’s High School located in Hudson, Wisconsin. This project included a 9 Million Dollar site to include a synthetic turf field, softball fields, running track, bleacher seating for 3,000 spectators, concessions, and bathrooms.

Services Provided

  • Site Evaluation
  • Master Planning
  • Construction Documents
  • Storm Water Management
  • Permit Preparation
  • Bleacher Vendor Selection Process
  • Synthetic Turf Vendor Selection Process
  • Bid Coordination
  • Construction Services
  • Camera Installation and Removal
  • Website Administration

Project Details

Location:

Menasha Joint School District
Nathan Calder Stadium
950 appleton Street
Menasha, WI 54952

Clientele:

Athletics

Overview

Rendering

Nathan Calder Stadium

Project Overview

Point of Beginning provided civil engineering, architectural design, and construction services for the development of the outdoor athletic facility for the Menasha Joint School District, Nathan Calder Stadium, located in Menasha, Wisconsin. This project included improvements to the entry way, refurbishing of stadium seating, installment of synthetic turf inside the track, relocation, and reconstruction of the pole vault, discus, and shot put events, and the construction of a competition soccer field.

Services Provide

  • Site Evaluation
  • Geotechnical Investigation
  • Wetland Delineation & Mapping
  • Topographic Survey
  • Plat of Survey Map
  • Private Utility Lines Locates
  • Site Planning, Construction Documents
  • Stormwater Management
  • Permit Preparation
  • Bid Coordination
  • Construction Services
  • Meetings/Site Visits

Project Details

Location:

Menasha Joint School District
Nathan Calder Stadium
950 appleton Street
Menasha, WI 54952

Clientele:

Athletics

Time-Lapse

Overview

Rendering

Lakeland University

Project Overview

Point of Beginning provided civil engineering, architectural design, and construction services for the development of the outdoor athletic facility for Lakeland University located in Sheboygan, Wisconsin. This project is to be constructed in the summer of 2017 and will include a synthetic turf football/soccer field, bleachers, stadium lighting, and a gateway entry.

Services Provided

  • Site Evaluation
  • Wetland Delineation & Mapping
  • Geotechnical Investigation
  • Topographic Survey & Mapping
  • Master Planning
  • Fundraising Support
  • Construction Documents
  • Storm Water Management
  • Permit Preparation
  • Synthetic Turf Vendor Selection
  • Bid Coordination
  • Construction Services
  • Construction Layout

Project Details

Location:

Lakeland University
W3718 South Drive
Plymouth, WI 53073

Clientele:

Athletics

Time-Lapse

Overview

Rendering

Kimberly High School

Project Overview

This project consisted of providingsite design and stormwater managementservices for the development of the indoor athletic facility for the Kimberly High School located in Kimberly, Wisconsin. Point of Beginning also assistedthe architectural firm in regards to the inside placement of field events.

Services Provided

  • Site Evaluation
  • Geotechnical Coordination
  • Survey
  • Construction Documents
  • Storm Water Management
  • Permit Preparation
  • Bid Coordination
  • Construction Administration
  • Staking
  • Meetings/Site Visits

Project Details

Location:

Kimberly High School
16620 E Kennedy Avenue
Kimberly, WI 54136

Clientele:

Athletics

Time-Lapse

Rendering

Pulaski Community School District

Project Overview

In its entirety, the new athletic complex master plan consists of approximately 53 acres and has been divided into phases. Phase I consisted of the development of a football stadium with track and field event spaces and was completed in the summer of 2016. Phase II consists of Varsity and JV baseball and softball fields, practice fields, parking lot, a pedestrian walk way, and soccer fields at the Middle School.

Services Provided

  • Site Evaluation
  • Topographic Survey and Mapping
  • Needs Assessment
  • Concept Planning
  • Master Planning
  • Geotechnical Investigation Coordination
  • Construction Documents
  • Stormwater Management
  • Local and Governmental Permit Preparation
  • Bid Coordination
  • 3D Model
  • Construction Layout
  • Construction Administration
  • Material Testing

Project Details

Location:

Pulaski High School
1040 S St Augustine St
Pulaski, WI 54162

Clientele:

Athletics

Time-Lapse
Fly Over 1
Fly Over 2

Osceola School District

Project Overview

This project included the development of a new athletic complex for the Osceola School District. Point of Beginning worked alongside of the Architect and School District to provide concept planning and master planning services during the pre-referendum stage. After the referendum was passed, Point of Beginning provided design and survey services to develop a 9-lane running track, synthetic turf football/soccer field, running and throwing event areas, new home and visitor bleachers,  concession stand, restroom facilities, and press box.  The project design included updated storm water management systems and detention areas, which included the installation of proper under drain systems, to correct existing flooding problems.

Services Provided

  • Site Evaluation
  • Topographic Survey and Mapping
  • Needs Assessment
  • Concept Planning
  • Master Planning
  • Geotechnical Investigation Coordination
  • Construction Documents
  • Stormwater Management
  • Local and Governmental Permit Preparation
  • Bid Coordination
  • 3D Model
  • Construction Layout
  • Construction Administration
  • Material Testing.

Project Details

Location:

Osceola High School
1111 Oak Ridge Drive
Osceola, WI 54020

Clientele:

Athletics

Time-Lapse
Fly Over

Kaukauna Area School District

Project Overview

This project consisted of two phases. Phase 1 included the development of a new 8-lane, 9-sprint lane track, all-weather surface and striping, the construction of new field events, a synthetic turf football field, 2,200 seat capacity home bleachers with storage area, 500 seat capacity visitor bleachers, a natural turf soccer field with press box / shelter area, upgraded baseball fields to include batting cages, new stadium lights for the football and soccer fields, plaza with an entry statement and ticket booth, and storm water retention areas. Phase 1 also consisted of an indoor practice facility that included a weight room and auxiliary room.

Phase 2 included a new synthetic turf softball field with dirt infield, new bleachers, protective netting, batting cages and bullpen.

Services Provided

  • Site Evaluation
  • Concept Planning
  • Master Planning
  • Geotechnical Coordination
  • Construction Documents
  • Stormwater Management
  • Permit Preparation
  • Bid Coordination
  • Construction Administration
  • Construction Layout.

Project Details

Location:

Kaukauna High School
1701 County Rd CE
Kaukauna, WI 54130

Clientele:

Athletics

Time-Lapse 1
Time-Lapse 2
Fly Over
Testimonial

Franklin Public School District

Project Overview

This project consisted of providing design, survey, and construction administration for the development of a new 8-lane track with 9 sprint lanes, which will include an all-weather surface and striping, the construction of new jumping events such as the high jump located in the “D” area, long jump, triple jump, and pole vault, the construction of one discus throwing event area and two shot put throwing areas, and the construction of a 200 foot competition softball field. This project included the placement of new synthetic turf on the football and soccer field, new lighting and scoreboard, construction of a visitor bleacher pad and 2 storage buildings.

Services Provided

  • Site Evaluation
  • Needs Assessment
  • Concept Planning
  • Master Planning
  • Wetland Delineation
  • Mapping Coordination
  • Geotechnical Coordination
  • Construction Documents
  • Stormwater Management
  • Permit Preparation
  • Bid Coordination
  • Construction Services.

Project Details

Location:

Franklin High School
8222 S 51st Street
Franklin, WI 53132

Clientele:

Athletics

Time-Lapse 1
Time-Lapse 2