Tomorrow River School District – Falcon Pride Project

Project Overview

The project consists of multiple improvements for the school district, including expanded parking areas, a gated entry way with ticket booths, synthetic turf stadium field, eight-lane running track, increased home/visitor spectator seating, revised field event layout, tennis courts, along with a newly constructed baseball field and softball field.

Services Provided

  • Site Evaluation
  • Topographic Survey & Mapping
  • Private Utility Line Locates Coordination
  • Geotechnical Investigation Coordination
  • Concept & Master Planning
  • Fundraising Support

Project Details

Location:

Tomorrow River School District
357 N Main St
Amherst, WI 54406

Clientele:

Athletics


Flyover

Pulaski Community School District Phase II

Project Overview

In its entirety, the new athletic complex master plan consists of approximately 53 acres and has been divided into phases. Phase I consisted of the development of a football stadium with track and field event spaces and was completed in the summer of 2016. Phase II, summer 2018 construction, consists of Varsity and JV baseball and softball fields, practice fields, parking lot, and a pedestrian walk way.

Services Provided

  • Site Evaluation
  • Wetland Permit Preparation
  • Geotechnical Investigation Coordination
  • Construction Documents
  • Stormwater Management
  • Permit Preparation
  • Bid Coordination
  • Contract Administration
  • Construction Administration
  • Construction Inspection/Testing
  • Construction Layout

Project Details

Location:

Pulaski Community School District
1040 S St Augustine St
Pulaski, WI 54162

Clientele:

Athletics

Muskego – Norway Schools

Project Overview

This project will consist of POB assisting JW in the bleacher pad design (2,500 seat capacity) to include grading, demolition and layout. POB will also be working side-by-side with H&H Civil on the design/construction of the new synthetic turf football field.

Services Provided

  • Site Evaluation
  • Topographic Survey & Mapping
  • Private Utility Line Locates Coordination
  • Wetland Delineation & Mapping Coordination
  • Geotechnical Coordination
  • Construction Documents
  • Stormwater Management
  • Permit Preparation
  • Construction Administration

Project Details

Location:

Muskego High School
W183 S8750 Racine Avenue
Muskego, Wisconsin 53150

Clientele:

Athletics

School District of Elmbrook

Project Overview

This project consists of two high schools within the School District of Elmbrook, Central & East, that will undergo renovations this upcoming (2018) summer.

Brookfield Central High School is located at 16900 West Gebhardt Road, Brookfield, Wisconsin. This school site will consist of a total of nine (9) tennis courts and two (2) softball fields including natural grass infields/outfields, standard backstops, and stormwater drainage system.

Brookfield East High School is located at 305 North Lilly Road, Brookfield, Wisconsin. This school site will consist of a total of nine (9) tennis courts and two (2) softball fields including natural grass infields/outfields, standard backstops, and stormwater drainage system.

Services Provided

  • Site Evaluation
  • Fundraising Support
  • Wetland Delineation & Mapping
  • Geotechnical Investigation
  • Topographic Survey & Mapping
  • Private Utility Line Locates Coordination
  • Construction Documents
  • Stormwater Management
  • Permit Preparation
  • Bid Coordination
  • Contract Administration
  • Construction Administration
  • Construction Layout
  • Construction Testing
  • Camera Installation/Removal & Website Administration

Project Details

Location:

Brookfield Central High School
16900 West Gebhardt Road
Brookfield, WI 53005
Brookfield East High School
3305 North Lilly Road
Brookfield, WI 53005

Clientele:

Athletics

Durand-Arkansaw School District

Project Overview

This project will consist of the redevelopment of the outdoor athletic complex to include a natural turf football field, eight-lane track, shot put/discus, long jump/triple jump, pole vault areas, dedication wall, ticket booth/plaza, press box, extension of existing bleachers and pad, stadium lighting, storage shed, and renovations to the existing parking lot with room for future parking.

Services Provided

  • Site Evaluation
  • Topographic Survey & Mapping
  • Private Utility Line Locates Coordination
  • Construction Documents
  • Stormwater Management
  • Permit Preparation
  • Bid Coordination
  • Construction Administration
  • Construction Layout
  • Construction Inspection/Testing

Project Details

Location:

Durand High School
607 7th Avenue East
Durand, WI 54736

Clientele:

Athletics

Medford Area Public School District

Project Overview

This project includes the development of a new running track and multipurpose synthetic turf field to support football and soccer at the Medford Area Senior High School

Services Provided

  • Site Evaluation
  • Topographic Survey & Mapping
  • Construction Documents
  • Stormwater Management
  • Permit Preparation
  • Bid Coordination
  • Construction Administration
  • Construction Layout
  • Material Testing

Project Details

Location:

Medford High School
1015 West Broadway Ave
Medford, WI 54451

Clientele:

Athletics

Hortonville High School

Project Overview

This project will consist of the installation of a synthetic turf surface for the football and soccer fields, new home team bleachers with 2,004 seats and locker rooms, the relocation of existing home side bleachers and press box to the visitors side, two-way long and triple jump lanes, two-way pole vault lanes, a new plaza and concessions area, entry and ticket booths, new scoreboard, and flag poles. Additionally the design will include re-surfacing of the existing track, reconfiguration of the existing bleachers and the existing fence around the new bleacher layout, and widened concrete walkways to include lighting.

Services Provided

  • Site Evaluation
  • Fundraising Support
  • Geotechnical Investigation
  • Topographic Survey & Mapping
  • Construction Documents
  • Stormwater Management
  • Permit Preparation
  • Synthetic Turf Vendor Selection Process
  • Bid Coordination
  • Construction Administration
  • Construction Layout
  • Construction Inspection/Testing
  • Camera Coordination & Website Administration

Project Details

Location:

Hortonville High School
155 Warner Street
Hortonville, WI 54944

Clientele:

Athletics

Time-Lapse

Menomonee Falls High School

Project Overview

Point of Beginning provided civil engineering, architectural design, and survey services for the development of the synthetic turf football field for the Menomonee Falls School District, located in Menomonee Falls, Wisconsin.

Project Details

Location:

Menomonee Falls High School
W142 N8101 Merrimac Drive
Menomonee Falls, WI 53051

Clientele:

Athletics

Time-Lapse