Sauk Prairie School District, Tower Rock Elementary

Project Overview

This project consisted of the construction building additions to the existing elementary school, including classrooms, offices, a library, a kitchen, and a music room. This project also included two parking lot and bus/parent drop off areas, playground areas, and athletic fields.

Services Provided

  • Site Evaluation
  • Site Planning
  • Construction Documents
  • Septic System Design & Coordination
  • Stormwater Management
  • Permit Preparation

Project Details

Location:

Tower Rock Elementary
S9033 Denzer Road
Prairie du Sac, WI 53578

Clientele:

K-12– Education

Sauk Prairie School District, Bridges Elementary

Project Overview

This project consisted of the demolition and construction of a new elementary school, two different parking lots, a soccer field, playground area, and an FFA area.

Services Provided

  • Site Evaluation
  • Site Planning
  • Construction Documents
  • Stormwater Management
  • Permit Preparation

Project Details

Location:

Bridges Elementary
1200 Broadway Street
Prairie du Sac, WI 53578

Clientele:

K-12– Education

The School District of Prescott, High School

Project Overview

This project consisted of Point of Beginning providing survey / design services for the construction of a new High School. The project included the construction of an educational facility, which consisted of classrooms, offices, auditorium, cafeteria, and gymnasium, two parking lots with associated drives, bus drop off area, parent drop off area, and a stormwater detention pond.

Services Provided

  • Site Evaluation
  • Topographic Survey and Mapping
  • Construction Documents
  • StormWater Management
  • Local and State Permit Preparation

Project Details

Location:

Prescott High Schoolt
1010 Dexter Street
Prescott, WI 54021

Clientele:

K-12 – Education

Independence Community School District

Project Overview

This project consisted of Point of Beginning working side-by-side with the Architect and School District and providing survey / design services for the construction of a new High School/Middle School. The project included the construction of a 170,000 square foot educational facility, which consisted of classrooms, offices, auditorium, cafeteria, and gymnasium, three parking lots with associated drives, and a storm water management facility. Point of Beginning provided design for a water loop around the building to service a series of fire hydrants to ensure fire protection.

This project also consisted of providing design and construction services for the installation of new synthetic turf at Leinbaugh Field and tennis courts & a baseball/softball facility at the high school. The project included the installation of turf inside the entire oval, including the “D” areas at Leinbuagh Field, excavation work, fencing, lighting, & gravel parking lot at the tennis courts, and a 300 car parking lot with adjacent drive way and storm water management pond at the baseball/softball fields. The existing site at Leinbaugh Field included a recently replaced track, which the district opted to maintain. The lining of the synthetic turf included both football and soccer sports. This project also included the updated modifications to the site’s existing storm water management system.

Services Provided

  • Site Evaluation
  • Topographic Survey and Mapping
  • Construction Documents
  • Stormwater Management
  • Local and State Permit Preparation

Project Details

Location:

Independence Community High School & Middle School
1207 1st St W
Independence, IA 50644

Clientele:

Athletics