West De Pere School District

Project Scope

High School – This project scope consisted of reconfiguration/expanded parking, stadium improvements to include sprint lane expansion, new home bleachers and concession/restroom/storage building and an indoor turf practice facility addition to the high school.
Middle School – This project scope consisted of resurfacing the existing parking lot/drop off and new concrete sidewalk.
Intermediate School – This project scope consisted of a new middle school building with a parent drop-off area, visitor parking and a new playground.
Elementary School – This project scope consisted of an expansion to the parking lot, new concrete sidewalk, a playground and new softball fields with concession/restroom building.

Services Provided

  • Site Evaluation
  • Topographic Survey and Mapping
  • Concept Planning
  • Master Planning
  • Construction Documents
  • Storm Water Management
  • overnmental Permit Preparation
  • Bid Coordination
  • Construction Services
  • Private Utility Lines Locate.

Project Details

Location:

West De Pere School District
De Pere, WI

Clientele:

Athletics

Deforest Area School District – Windsor Elementary

Project Overview

This project consisted of the redevelopment of approximately 12 acres, in the Town of Windsor, for the DeForest Area School District - approved via Referendum in April of 2015.

The scope of the project included demolition of a portion of the existing structure with an addition of a new 109,000 square foot building that includes a 2-story academic and administrative wing, a music/art room, cafeteria/commons area, and a gymnasium.

The exterior of the project will include development of three driveways from Windsor Road to provide building access. The first driveway is used as the main entry and exit of the new parent drop-off, also serving as the perimeter for the event parking lot. The second driveway is used as an entrance to the bus loop, which has the ability to accommodate 8 buses and provide a perimeter for the staff parking lot. The third driveway serves as the bus loop exit, providing access to the hard-surface playground and receiving area. Also included was associated entry statements and new curb cuts for the right turn lane expansion at Windsor Road.

Services Provided

  • Site Evaluation
  • Site Planning
  • Construction Documents
  • Storm Water Management
  • Permit Preparation
  • Bid Coordination
  • Construction Services & Meetings

Project Details

Location:

Windsor Elementary
4352 Windsor Road
DeForest, WI 53532

Clientele:

K-12

DeForest Area School District – Eagle Point Elementary

Project Overview

This project consisted of the redevelopment of approximately 10 acres, in the Village of DeForest, for the DeForest Area School District - approved via Referendum in April of 2015.

The scope included the demolition of the existing 98,000 square foot building and a new building addition of like-size that included a 2-story academic wing, kindergarten, gymnasium, cafeteria/commons area, and administrative space. The building exterior compliments the building design, starting with an event parking lot, receiving entrance, and hard-surface playground area, accessible from N. Cleveland Avenue.

A new bus loop with the ability to accommodate 8 buses, with separate entry and exit to E. Holum Street, provides safe student access into the new cafeteria/commons area. N. Johnson Street access drive serves as a dual entry to new staff parking as well as parent drop-off flanked by 29 visitor parking spaces. At the corner of N. Cleveland Avenue and E. Park Avenue, a large green spaces lay, along with associated curb and entry statements.

Services Provided

  • Site Evaluation
  • Site Planning
  • Construction Documents
  • Storm Water Management
  • Permit Preparation
  • Bid Coordination
  • Construction Services & Meetings

Project Details

Location:

Eagle Point Elementary
201 N. Cleveland St
DeForest, WI 53532

Clientele:

K-12

Sauk Prairie School District, Tower Rock Elementary

Project Overview

This project consisted of the construction building additions to the existing elementary school, including classrooms, offices, a library, a kitchen, and a music room. This project also included two parking lot and bus/parent drop off areas, playground areas, and athletic fields.

Services Provided

  • Site Evaluation
  • Site Planning
  • Construction Documents
  • Septic System Design & Coordination
  • Stormwater Management
  • Permit Preparation

Project Details

Location:

Tower Rock Elementary
S9033 Denzer Road
Prairie du Sac, WI 53578

Clientele:

K-12– Education

Sauk Prairie School District, Bridges Elementary

Project Overview

This project consisted of the demolition and construction of a new elementary school, two different parking lots, a soccer field, playground area, and an FFA area.

Services Provided

  • Site Evaluation
  • Site Planning
  • Construction Documents
  • Stormwater Management
  • Permit Preparation

Project Details

Location:

Bridges Elementary
1200 Broadway Street
Prairie du Sac, WI 53578

Clientele:

K-12– Education

The School District of Prescott, High School

Project Overview

This project consisted of Point of Beginning providing survey / design services for the construction of a new High School. The project included the construction of an educational facility, which consisted of classrooms, offices, auditorium, cafeteria, and gymnasium, two parking lots with associated drives, bus drop off area, parent drop off area, and a stormwater detention pond.

Services Provided

  • Site Evaluation
  • Topographic Survey and Mapping
  • Construction Documents
  • StormWater Management
  • Local and State Permit Preparation

Project Details

Location:

Prescott High Schoolt
1010 Dexter Street
Prescott, WI 54021

Clientele:

K-12 – Education

Independence Community School District

Project Overview

This project consisted of Point of Beginning working side-by-side with the Architect and School District and providing survey / design services for the construction of a new High School/Middle School. The project included the construction of a 170,000 square foot educational facility, which consisted of classrooms, offices, auditorium, cafeteria, and gymnasium, three parking lots with associated drives, and a storm water management facility. Point of Beginning provided design for a water loop around the building to service a series of fire hydrants to ensure fire protection.

This project also consisted of providing design and construction services for the installation of new synthetic turf at Leinbaugh Field and tennis courts & a baseball/softball facility at the high school. The project included the installation of turf inside the entire oval, including the “D” areas at Leinbuagh Field, excavation work, fencing, lighting, & gravel parking lot at the tennis courts, and a 300 car parking lot with adjacent drive way and storm water management pond at the baseball/softball fields. The existing site at Leinbaugh Field included a recently replaced track, which the district opted to maintain. The lining of the synthetic turf included both football and soccer sports. This project also included the updated modifications to the site’s existing storm water management system.

Services Provided

  • Site Evaluation
  • Topographic Survey and Mapping
  • Construction Documents
  • Stormwater Management
  • Local and State Permit Preparation

Project Details