Project Overview

This project included the development of a new athletic complex for the Osceola School District. Point of Beginning worked alongside of the Architect and School District to provide concept planning and master planning services during the pre-referendum stage. After the referendum was passed, Point of Beginning provided design and survey services to develop a 9-lane running track, synthetic turf football/soccer field, running and throwing event areas, new home and visitor bleachers,  concession stand, restroom facilities, and press box.  The project design included updated storm water management systems and detention areas, which included the installation of proper under drain systems, to correct existing flooding problems.

Services Provided

  • Site Evaluation
  • Topographic Survey and Mapping
  • Needs Assessment
  • Concept Planning
  • Master Planning
  • Geotechnical Investigation Coordination
  • Construction Documents
  • Stormwater Management
  • Local and Governmental Permit Preparation
  • Bid Coordination
  • 3D Model
  • Construction Layout
  • Construction Administration
  • Material Testing.

Project Details

Location:

Osceola High School
1111 Oak Ridge Drive
Osceola, WI 54020

Clientele:

Athletics